Live 89,289 players 11,829 servers online 107 fresh wipes in 3 hours Refreshed every five minutes

Live Rust population watch: who's up, who's down, who just wiped.

Camera-shy: no banner published MS Project | SOLO/DUO Onlineright now
Celebrity profile

MS Project | SOLO/DUO

Online 80.221.91.195:28015 checked 1h ago

moddedcarbon
Get on the guest list

Vital stats

Players now 0/ 25 slots 0% full steadyagainst this time yesterday
7-day average0peak –
Rank#15,426top 69%
Region–no continent published · group 8, the default
Last wipe12d agono schedule published
Next wipe–no rhythm it keeps
The rise

Players

AveragePeak
0123419:0004:0013:0023:0008:0017:00

Hourly average and peak, UTC.

Behind the scenes

Server performance

010020030040019:0004:0013:0023:0008:0017:00

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Climbing the charts

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep27 Sep3 Oct15 Oct21 Oct28 Oct

Top 69% of all ranked servers. Ranked on player hours over the last seven days.

The wipe diary

Wipe schedule

no rhythm it keeps

Its wipes keep no rhythm, so there is no next wipe to predict. Every server wipes at the monthly force wipe.

14 days
usual gap
between real wipes
0%
on rhythm
of its recent wipes
1
wipe-day peak
players, last three wipes
0%
crowd held
else halves by day 1

The first 48 hours of its last wipes

Thu 15 OctSat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 0, 0 hours in.

Past seasons

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Thu 15 Oct, 20:05 UTC12d ago 0 – running 0
Sat 26 Sep, 09:07 UTC32d ago 1 halved by day 1 19.5 days 1
Thu 17 Sep, 20:03 UTC40d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

You might also like

Similar servers

The same kind of game, then region, group limit, rate and wipes.

The interview

Quick answers

From the figures on this page.

Tags

Which Rust Pop Watch lists and filters include MS Project | SOLO/DUO?

These are the Rust Pop Watch lists that include MS Project | SOLO/DUO: Modded Rust servers, live. These filters bring it up on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last 2 weeks.

What do the server tags on MS Project | SOLO/DUO mean?

The game's server browser picks up these tags from MS Project | SOLO/DUO: gmrust (Game mode): Survival, standard Rust style; mp25 (Max players): There are 25 slots; ts8 (Group limit): The default team size of 8 applies here; v2633 (Protocol): The game protocol is 2633, so your client has to match it to join; cs162929 (Build): It's on game build 162929; ptrak (Networking): It uses RakNet, the standard network layer for the game; $r? (Region code): No region code has been set; ^z (Modded): The game is changed by plugins or settings, hence the Modded listing; ^y (Carbon): A plugin framework called Carbon is running here. Current players, queue and world age are in the tags too, displayed at the top of this page.

The players

How does MS Project | SOLO/DUO rank against other Rust servers?

A seven-day player-hours placing of #15,426 puts MS Project | SOLO/DUO in the top 69% of all ranked servers.

How many players are on MS Project | SOLO/DUO right now?

MS Project | SOLO/DUO is holding 0 players, with 25 slots in total. Across the past week it drew an average of 0 players.

About the server

Is MS Project | SOLO/DUO online, and how reliable is it?

Right now, MS Project | SOLO/DUO is up and running. About 6 hours ago is when it last restarted, judging by its uptime. Out of 168 hours in the last 7 full days, it was online for 168, a 100% uptime. The first time Rust Pop Watch saw it was 13 September 2026.

Does MS Project | SOLO/DUO run smoothly?

The 48-hour average was 237 server fps, with a low of 227. The world carried as many as 72,127 entities, including buildings and deployables. The highest memory usage was 2,984 MB. What players experience as lag comes from low fps and a rising entity count.

Where is MS Project | SOLO/DUO located?

There is no region from MS Project | SOLO/DUO. It is where a server says it is that Rust Pop Watch shows; the machine's actual location is not looked up. Connect at 80.221.91.195:28015.

Which Rust version is MS Project | SOLO/DUO on?

On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. Steam updates your game so it matches the protocol needed to join.

The wipe schedule

What happens on MS Project | SOLO/DUO when wipe day comes around?

Across its recent wipes, the busiest point averaged 1 players. The crowd on the latest wipe topped out 0 hours in. Its recent wipes kept the crowd above half the peak until the next one 0% of the time. In the wipes that didn't hold, the crowd sank below half by day 1.

What is the wipe schedule on MS Project | SOLO/DUO?

No next wipe can be predicted for MS Project | SOLO/DUO: its wipes happen at irregular times. A force wipe comes round every month for all Rust servers, with the next on Thursday 5 November at 19:00 UTC. 12 days 22 hours is when the present world was made.

The rules

Which map does MS Project | SOLO/DUO run?

A procedural map of 3,500 with seed 150644954 is what MS Project | SOLO/DUO runs, made by the game. RustMaps has it from this page, since identical size and seed give an identical map.

What are the rules and settings on MS Project | SOLO/DUO?

The name of MS Project | SOLO/DUO says nothing about gather rate. Eight players per group: that is the game's default. survival is the game mode, the usual game of gathering, building and raiding. Fighting and raiding between players is allowed. Plugins or settings alter the game, and the browser lists it as Modded. The plugin count is Carbon. The VAC anti-cheat from Valve is on.

Getting in

How do I join MS Project | SOLO/DUO?

The console method: start Rust, press F1, and type client.connect 80.221.91.195:28015. Launch Rust on this page is another way, opening Rust via Steam and connecting.

Decoded

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Survival, standard Rust style.
mp25
Max players There are 25 slots.
ts8
Group limit The default team size of 8 applies here.
v2633
Protocol The game protocol is 2633, so your client has to match it to join.
cs162929
Build It's on game build 162929.
ptrak
Networking It uses RakNet, the standard network layer for the game.
$r?
Region code No region code has been set.

Mods and access

^z
Modded The game is changed by plugins or settings, hence the Modded listing.
^y
Carbon A plugin framework called Carbon is running here.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.